Wessex Water would like to use cookies on your computer to help make this website work better for you. One of the cookies we use is essential for parts of the site to operate and has already been set. You may delete and block all cookies from this site, but doing this will mean that parts of the site will not work. To find out more about the cookies we use and how to delete them, see our
cookie notice.
I accept cookies from this site
New connection charges
Standard water supply service connections 2012/13
| Unmade surfaces |
| Connection up to 32mm up to two metres of trench basic charge |
£373 |
| Where the developer provides all excavation for ducts |
£319 |
| Charge per additional linear metre of trench up to 20 metres |
£41 |
| Made up surfaces (does not include permanent reinstatement) |
| Connection up to 32mm up to two metres of trench basic charge |
£445 |
| Charge per additional linear metre of trench, as measured for reinstatement purposes up to 20 metres |
£65 |
| Each additional connection through same duct or trench |
| Unmade/made up surfaces |
£183 |
| Permanent reinstatement per linear metre |
| Carriageways |
£90 |
| Footpaths |
£71 |
| Building water charges |
| Water used in the construction/conversion of the property (not the physical connection) |
£70 |
| General |
| Failure to have site ready for inspection at an agreed time |
£50 |
| Failure to have site ready for connection at an agreed time |
£75 |
| Infrastructure charges |
| Sewage |
£328 |
| Water |
£328 |
Please consider the environment before printing this page
Printer friendly page